Veejay Syntex

Funding
TextileSurat, Gujarat36 mo term

Overview

About the project

Polyester yarn manufacturer in Surat with 9 ECMs identified across compressed-air, motors, fans, and VFDs. The bundle is led by a high-leverage motor right-sizing on the ring-frame line — the single largest savings ECM in our KISEM corpus.

Financial notes

Target return floats with realized savings. The senior tranche is sized to the bundle's blended P5 floor at DSCR ≥ 1.30×; junior absorbs first-loss until Day-90 verification tightens the band. Where ECMs include zero-CAPEX optimizations (operational tweaks), those are listed for transparency but excluded from the senior covenant — the financed senior covers CAPEX-eligible ECMs only.

What matters

Key highlights

Senior + Junior split

Moderate bundle σ — senior + junior split with junior absorbing first-loss until Day-90.

9-ECM bundle

Single auditor, single facility, 9 ECMs. Each ECM has its own predicted-savings band; the senior is sized to the bundle's P5 sum, not the sum of individual P50s.

PINN unified — 21-feature audit

Served by the unified PINN (21-feature audit, IN-BEE). TabPFN benchmark headline: R²=+0.56 LOO on 6-feature corpus (n=72 KISEM + 14,482 IAC).

Carbon §11 accrual

tCO₂e accrues monthly per the §11 disclosure schedule across all ECMs on the same meter.

Deployment

Upgrades & equipment · 9 ECMs

Compressed-air system
Motor upgrade
VFDs / motor controls
Fan upgrade

Polyester yarn manufacturer in Surat with 9 ECMs identified across compressed-air, motors, fans, and VFDs. The bundle is led by a high-leverage motor right-sizing on the ring-frame line — the single largest savings ECM in our KISEM corpus.

Bundle: 9 ECMs · ₹47,15,000 CAPEX · blended grade B. Total baseline draw under audit: 29,29,000 kWh/yr.

Operations

Project management

Audited by KISEM-IIT Gandhinagar. Day-30 and Day-90 verification reports tighten the bundle's conformal band as realized meter data accrues; if realized savings fall below the blended P5 floor, the borrower triggers the §5.6 cure mechanism. KISEM-affiliated auditor is BEE-certified; equipment carries OEM warranties typical for India MSME retrofits.

Underwriting

Calibrated savings · 9 ECMs

Bundle summary

Blended grade B
Total P50 savings

1.18 GWh

sum of ECM point estimates

P5 floor (bundle)

795K kWh

conservative sum

Bundle investment

₹47.1 L

sum of ECM CAPEX

Carbon §11

969.6 tCO₂/yr

monthly accrual

Predicted annual savings (90% conformal PI)
Grade B
P5 (floor)
90,068 kWh/yr
Point
138,566 kWh/yr
P95
187,064 kWh/yr
DSCR @ P5

4.59×

≥ 1.30× covenant

DSCR @ P50

7.07×

≥ 1.75× target

Carbon §11

113.6 tCO₂/yr

CDM AMS-II.E (energy efficiency MSMEs)

Leakage repair + receiver sizing on plant compressed-air loop. 138K kWh/yr.

PINN unified sized 9 ECMs on the same meter under the DSCR-at-P5 ≥ 1.30× covenant. The serving model ingests all 21 fields from the audit schema (leakage, rated kW, hours/days, plant context); calibration is fit on a 72-ECM Indian audit corpus. Blended grade B senior + junior split; junior absorbs first-loss until Day-90 verification tightens the band. See full benchmarks for the leave-one-out residuals and reproduction script. Carbon credits accrue on the same meter under the project's disclosure schedule.

MRV

Baseline & impact

Baseline energy / yr

2,929,000 kWh

Fuel type

electric

Verification progress0 / 0 attested

Auditors

  • KISEM...11111

Tool

Returns calculator

Investment amount$25,000
$25,000 min$56,807 remaining

Estimated total return

$34,900.00

Over 36 months @ 13.20%

Avg. monthly income

$275.00

Pre-tax, indicative only

Indicative only. Calculations based on a target XIRR of 13.20%. Actual returns may vary based on project performance and timing of distributions.

Attachments

Documents

  • KISEM-IIT Gandhinagar Audit Report.pdf
    Download
  • Ring-Frame Motor Replacement Brief.pdf
    Download
  • Compressed-Air Optimization Plan.pdf
    Download

History

Repayment history

No distributions yet.